Half Work, Half Play, Half other stuff

BIM, the Built Environment and Stuff

  • Home
  • About

Posts Tagged alteration

BIM Required on Alteration and Adaptation over $2.5M: Wisconsin

Posted by Jim Foster in BIM, Built Environment, IFC, Point to Point Laser Technology on June 29, 2009

So the GSA took the lead and states are starting to follow. Wisconsin announced that on all addition and alteration projects that require $2.5M or greater that a BIM is required. With this announcement they also released there own set of guidelines. Interesting note is that both the GSA and Wisconsin are platform agnostic and refer to software as BIM authoring software or discipline specialty software, and that it must be IFC compliant.

So when does the movement around IFC begin like Linux?


[Translate]
Share

adaptation, alteration, BIM, Built Environment, IFC

No Comments

  • BIM, Half Play, the Built Environment and Stuff

    ↑ Grab this Headline Animator

  • RSS Boston Real Estate News

  • RSS Wall Street Journal: Technology

    • Mistakes the Fed Keeps Making
    • Two Decades Later, the Iraq War Is Hard to Defend
    • From Zero to Hero
  • Tags

    3D Adoption AEC aia as built Autodesk BIM Building built Built Environment CAD cloud disto Energy Energy Analysis energy modeling existing Existing Conditions Field google Green Green Building GSA IFC Interoperability ipad IPD laser LEED Market Navisworks PKNail pointcloud PointKnown Point to Point Laser Technology reality capture Revit ROI SaaS sketchup survey sustainable technology UK Virtual Construction
  • Check out my about.me profile!

Fusion theme by digitalnature | powered by WordPress
Entries (RSS) and Comments (RSS) ^

SetTextSize SetPageWidth
powered byGoogle