GM Embraces BIM


So I am reading this article on ‘GM Embraces BIM‘, and wondering if I should post it, becuase, well, GM has had better days, but the points they made such as “…GM estimates that they are able to construct a building 25% faster, saving 10-15% of construction cost. And they can do this much safer than in the past, setting industry records on safety.”  Is worth mentioning.

I have been reading a variety of articles recently that mention laser scanning, including this one, matter of factly, on how to capture the built environment in BIM, when in fact it can be a time intensive and laborious practice.  While we are looking forward to the day when anyone can walk into a room and wave a wand and have a BIM pop out you need to look at the technologies available today, they type of project and what your deliverable needs to be to make the most informed decisions.  Many times using PPLT (Point to Point Laser Technology) can be the most cost effective option.

Share

, , ,

  1. No comments yet.

You must be logged in to post a comment.