Posts Tagged BIM

Trimble offers 59% Premium for Tekla : Hardware meet software : Software meet hardware. : BIM

As Scooby would say, “yoinks”.  As reported in WSJ and I am sure many other places.

HELSINKI (Dow Jones)–Finnish software company Tekla Corp. (TLA1V.HE) said Monday U.S. Trimble Navigation Ltd. (TRMB) has offered to buy the company for EUR15 a share in cash, a deal potentially worth EUR337 million.

One can see that an integrated hardware/software approach in the building industry could be a true winner.  If you talk to people about wanting to introduce technology into the construction trades and what they will say in between the laughing is ‘good luck.’  Easy to use deployable field technologies just don’t exist as they should, Trimble with their know how acquiring Tekla seems like a no brainer as when I first got into this biz, the one product that came up time and time again, before anyone mentioned BIM was that people were using Tekla from design to fabrication because it worked.  Recently Tekla announced their own flavors for BIM and 2D drafting, now being able to integrate those tools with the knowledge/expertise or even the combined sales force of Trimble, well, it starts to make a compelling argument.  Queen to Bishop 7, Autodesk what’s your next move.

Share

, ,

No Comments

“Owners have to be willing to spend more upfront” : Suffolk saves over $800K on one project. #BIM #Revit

Soft costs.  Used to be that 20% of any one project was the yardstick for soft costs, design, engineering, etc.  And it always seemed like it was the money that owners/developers loathe to spend.  Think about it ‘soft costs’ even the term makes you want to get rid of it or squash it.  But we are getting closer to full BIM embrace and a recent post on the Building Design Construction Web Site which highlighted some of Suffolk Construction’s experience using BIM.  Says Peter Campot, President of the Healthcare/Science and Technology division of New England’s Suffolk Construction

We need to transition from design as you go to a design and construction process.  We reinvent the wheel everyday right now. Would you ride in an airplane that was a prototype? Buildings are the same way, each is a one-off, but if you build it virtually you’ll build it right. Value-engineering, I would argue, is neither. If we get the construction model right there ARE no RFIs. Higher quality is what I care about. I’m in a reference business.  We need a paradigm shift. We need to restructure and transform the industry. Owners have to be willing to spend more upfront. It does come back to them in the end.

Jeff Yoder’s on his post goes on to state that Suffolk uses BIM on every project over $10M.  They use clash detection on every BIM project and recommend full BIM on any project over $50M.  They also purchased ipads for all their full time employees and use over 50 BIM related technologies and software.

What would be interesting to know is to see a costs schedule of building the ‘typical’ way and then using virtual construction methods.  For example, how much did a fully realized BIM model cost vs. 2D CD (Construction Doc) package, and then see the costs savings layered on top that.  Let’s get to apples v. apples, dollars v. dollars comparison, but I can’t believe there is any doubt that BIM saves you money, and maybe owners would be willing to split the difference in ‘savings’ or maybe there is a carrot out there the industry can adopt to share the ‘BIM’ winnings.

Share

, ,

No Comments

Google now to Digitize the Earth and Every Building On it : #BIM #GIS #3D

So trying to digitize every book, and mapping every street was not enough so Google (GOOG) has now gone after the earth and all its GIS data. Matt Rosoff of the San Francisco Chronicle Reports, “Google Attacks Huge New Market with Earth Builder” Google is stretching its brawn into specialized verticals that use to cost $millions to play in.

However, if you look at Autodesk and how it has started to push what they are calling “Reality Capture” and the energy modeling of the existing environment you understand the play.  Additionally, existing buildings are the biggest consumer of energy out there and the first to really to look to identify savings and efficiencies, there is a movement toward 20 by 2020, that is 20% increased efficeiny in commercial buildings by 2020, and capturing/modeling/retrofitting, etc. all part of it.  Well, I’m getting a little bit off topic, let’s repeat the SF Chronicle Headline, “Google Attacks Huge New Market”.  Google starting to frighten anyone yet?

Share

, ,

No Comments

UK Hits Pause Button on BIM Roll Out

As reported by Barry Sullivan on building.co.uk

Efforts to roll out Building Information Modelling across all public projects have hit an obstacle after a key government report on the effectiveness of the software has been met with a three-month delay. An independent report into the effectiveness of BIM on a number of pilot projects was submitted to the Construction Clients’ Group in March and the government was expected to produce its response that same month. However, sources close to the government said that it was put on hold because of local government elections in May. Paul Morrell, the chief construction advisor, subsequently confirmed to Building that the government response would be released in June.

In other BIM news Trimble joined the BuildingSmart alliance in a push to set standards so developers, manufacturers, etc. can leverage a common BIM thread.

 

Share

, ,

No Comments

BIM @ The London Olympics

Da na, na na na Na, na na (okay that was my best attempt at keystroking the Olympic theme song) also makes me wonder if I can say Olympics without some legal disclaimer.  Anyway, BIM is at work with the London Olympics, and not for what you orignally might think, but rather for the engineering and widening the M25 Motorway.

M25 Motorway Project

The M25 motorway that circles London is one of Europe’s busiest highways. In 2009, England’s Highways Agency awarded a US$10 billion contract to the Connect Plus consortium for future development, operation and maintenance of the M25 motorway.

Part of that contract includes widening over 23 miles of the motorway’s northwestern quadrant and 17 miles in the northeast from 3 lanes to 4. Construction commenced in the spring of 2009 and must be completed before the London 2012 Summer Olympics. This requires finishing construction in approximately half the time it typically takes for a project of this scope.

In fact Autodesk, in an Oscar worthy, let’s give awards to ourselves turn, awarded the joint venture of Atkins & Skanska Balfour Beatty a Autodesk BIM Experience Award, while I don’t know if you get a statue of glass obloid sort of thing, what I do know, is you don’t do this for the award, you do this because it makes sense, it saves money, it gets things done, so Kudos to you Atkins & Skanska Balfour Beatty, you real men (& women) of genius.

You can read more about the project here: BIM Motorway Project

 

Share

, ,

No Comments

In the BIM Room : “Your Chocolate is in my Peanut Butter”

So not a lot new here in discussing the use of BIM in the ‘Freedom Tower’ , or Tower 2, or WTC 2.  I have mixed emotions using WTC, as I imagine many do when mentioning the World Trade Center but having grown up in Jersey, commuting on the PATH to come out of its bowels and having so many friends working down there, well, mostly, it’ still good to say ‘WTC’ anyway while not much new about using BIM in the project except for the fact that this latest was reported by Fox News of all outlets.  So for most of us who troll for information about BIM and its uses in esoteric trade magazines, websites, and blogs the fact that Fox News picks up this BIM thread?  That part to me is news.

Quick excerpt from article below.  Full Jump Here

Serge Demerjian is a Development Manager for Silverstein Properties, the company building Tower 2.

“This is where the trades come together and work all the mechanical, plumbing, fire protection, electrical systems to make sure that they all fit within the space of the building that’s been designed,” he said.

Before the BIM process, a building has been designed and put on paper. BIM then creates a precise computer animated 3D model of how every part in the building will fit together. The goal? Make sure it will.

The chocolate and peanut butter reference was used by Serge in the article, while it’s “two tastes the taste great together”  having them in harmony, now that’s beauty of it, then again, maybe chocolate and peanut butter always taste great together, even if they’re just a mess on the plate that your 2 year old put together, so strike that metaphor with BIM, how about engineered tastiness, all right still working on it.  But mainstream media and BIM, now there’s two tastes that taste great together, wondering if BIM is right for you?  It is.

Share

, , ,

No Comments

Shaking the Cage : Trimble to Distribute Teklas’s BIM Sight

So on the heels of Tekla’s announcement that BIMSight will be free to use for BIM coordination, clash detection and the like, the next Press Release is that Trimble will be a ‘preferred’ distributor, what preferred connotates is anyone’s guess, however, the business model of Trimble corporate carrying Tekla software is different.  Now I know plenty of hardware resellers carry Leica and then are a VAR for Autodesk because they see the crossover but that’s not at the corporate level.  Corporate level commitment, that’s different.  Now I have heard people from Autodesk state, ‘we don’t do hardware’ meaning that their play is not to merge the worlds, however, Trimble and Tekla, different matter.  Trying to rattle the Autodesk hegemony, not sure, but one thing is sure and it’s that this BIM thing is a big tent, from design to energy modeling, to CFD (Computational Fluid Dynamics) etc. and that going BIM to Field is going to get bigger.  In fact, you can get Tekla’s software on Trimble’s Web site,  BIMtoField.com

“a Trimble Website dedicated to helping building owners, contractors, and engineers better understand the potential of solutions that allow the transfer of Building Information Modeling (BIM) data to field level systems for increased productivity and cost savings.”

A lot of people streaming into the Big BIM tent.

Share

, , ,

No Comments

Free BIM : Tekla Announces BIM Sight : It’s all about the data

Tekla BIM Sight Interesting news that Tekla announces a new product for BIM communication, BIMsight, how this differs from Navisworks?  well it’s free, and if you’ve seen people line up for free stuff at conventions, carnivals, playgrounds, sporting events, etc. you have to understand that ‘free’ gets people excited, but free is not necessarily good.  I don’t doubt that Tekla put together an excellent product  but the true value of the product comes from the people using it, trained on it,  understanding and leveraging it, however, dropping the initial price hurdle to well, zero can’t hurt.  It seems that it works like Navisworks in that BIM information is brought in for clash detection and project communication, I also wonder how the data is dealt with and stored; since I believe who ever has the data wins.  That is, your in the Autodesk camp using their products, storing info in the cloud through them, barriers to exit start rising, you start using BIMsight to communicate with your clients/subs/etc. your then living in Tekla’s world.  None of this necessarily a bad thing as standardization brings a lot of good and a lot of productivity gains, ask anyone who develops products for Windows.

However, begs the question, what’s the business model?  As we used to see firms with their core product and developing/purchasing products to surround/extend their offering, and normally charge for it.  In this case, give it away for free.  Does this bring more people to Tekla Structure?  Is there something else at work?  Why do I ask these questions? Probably too much coffee or detective novels when I was kid.  Maltese Falcon by the way, great book and great movie.

You can download BIM Sight for free, here.

Share

, , , , ,

No Comments

RMI to Host Summit for Energy Modeling : BIM

“Reliable and consistent building energy modeling services are key to maximizing energy efficiency and achieving aggressive performance goals in new and existing building construction. Currently, how ever, various barriers inhibit the cost-effective and high-quality analysis that can result in deep energy savings.”

You would have thought I wrote that myself, but I did not, thank Molly Miller from the Rocky Mountain Institute.  To learn more about the summit visit the RMI Website .  But things are starting to dovetail for building surveyors and energy modeling further enforcing the need for a trusted source when documenting existing buildings and analyzing them.  Read the quote from Kendra Tupper, Senior Consultant at RMI.

“There is a lack of confidence in the quality, consistency, and reproducibility of energy modeling results. Coupled with the fact that it’s time-consuming and expensive to conduct quality analyses, it’s difficult for practitioners to effectively use energy modeling to inform design and make compelling business cases for investing in energy efficiency.”

PBS, Professional Building Surveyors, pick up the phone.

Share

, , , ,

No Comments

BIM and Small Biz Survey Through Texas A&M

No new news here just spreading the word.

*******Original Post from the NIBS (National Institute of Building Sciences) Below *******

The Texas A&M University College of Architecture is seeking industry input. The college is surveying the industry to find out how the transition to building information modeling (BIM) is impacting small architectural firms. The survey is a key part of the data collection and is completely anonymous. The investigation has three central goals: to identify the current state of BIM adoption in architectural firms, to analyze the small firm BIM adoption process, and to develop a strategic model for small firm BIM adoption. Take the survey.

Share

, ,

No Comments